翻訳と辞書
Words near each other
・ USS Norfolk (1798)
・ USS Norfolk (DL-1)
・ USS Norfolk (SSN-714)
・ USS Norfolk Packet (1848)
・ USS Norman Scott (DD-690)
・ USS Normandy (CG-60)
・ USS Normannia (SP-756)
・ USS Norris (DD-859)
・ USS North Carolina
・ USS North Carolina (1820)
・ USS North Carolina (ACR-12)
・ USS North Carolina (BB-55)
・ USS North Carolina (SSN-777)
・ USS North Dakota
・ USS North Dakota (BB-29)
USS North Dakota (SSN-784)
・ USS Northampton
・ USS Northampton (CA-26)
・ USS Northampton (CLC-1)
・ USS Northampton (SP-670)
・ USS Norton Sound (AVM-1)
・ USS Norwich (1861)
・ USS Notable
・ USS Notable (AM-267)
・ USS Notable (MSO-460)
・ USS Nottoway
・ USS Nottoway (ATA-183)
・ USS Nourmahal (PG-72)
・ USS Noxubee (AOG-56)
・ USS Nucleus (AM-268)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

USS North Dakota (SSN-784) : ウィキペディア英語版
USS North Dakota (SSN-784)

USS ''North Dakota'' (SSN-784) is a of the United States Navy. She is the second U.S. Navy ship to be named for the U.S. state of North Dakota. She was commissioned in Groton, Connecticut on 25 October 2014.
== Construction ==
''North Dakota'' is the first of eight Virginia Class Block III ships. Approximately 20 percent of ''North Dakota'' was redesigned to lower acquisition cost and increase operational flexibility. The changes include a ship's bow redesign, replacing 12 individual launch tubes with two large-diameter Virginia Payload Tubes, each capable of launching six UGM-109 Tomahawk cruise missiles.〔

The contract to build her was awarded to Electric Boat division of General Dynamics in Groton, Connecticut on 14 August 2003. Her name was announced on 15 July 2008. and her keel was laid down on 11 May 2012.〔
〕 She was floated on 15 September 2013 and was christened on 2 November 2013, sponsored by Katie Fowler, wife of Vice Admiral Jeff Fowler.
The U.S. Navy accepted delivery of ''North Dakota'' on 29 August 2014 two days prior to its contract delivery date. The submarine successfully completed Alpha, Bravo, and Board of Inspection and Survey (INSURV) trials, which evaluate the submarine's seaworthiness and operational capabilities. During the trials, the crew took the submarine to test depth, conducted an emergency surfacing, and tested the submarine's propulsion plant. The U.S. Navy postponed ''North Dakota''´s original commissioning date of May 2014 because of quality issues with vendor-assembled and delivered components that required an unplanned dry-docking to correct. Additional design certification work was also required on the submarine's redesigned bow. ''North Dakota'' was commissioned on 25 October 2014 in Groton, Connecticut.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「USS North Dakota (SSN-784)」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.